Because things went so smoothly I have very little in the way of photo documentation during the bulk of the day's work. The work mostly included extending PVC pipe to the spigot, cutting inside ABS pipe to length within the cistern, and ensuring that the basin was deep enough to accommodate overflow from the ABS overflow line. Enough technical details. Here are the photos.
This is Basin 1. It is actually not for the water cistern but will be fed by a gutter system off the shop roof.
Working, digging, planting, supervising on Basin 2 that will receive overflow water from the cistern.
There is a lot of standing around happening in this picture, but consider it similar to one of those moments when suddenly there is silence among a large group of people - before, it was really chaotic, but for that moment it seems calm and ordered. Either way, we got heaps done.
Everything is sealed, sawn, and ready to get filled with water - as soon as we take the ladder out.
Everything is sealed, sawn, and ready to get filled with water - as soon as we take the ladder out.
1 comment:
beautiful!
good work.
k and i love your back yard!
Post a Comment